Skip to content

Buses and subsystems

A bus is a node of the network where the energy balance must hold. Its granularity is yours to choose: a large regional subsystem, a single substation or anything in between.

Where everything meets

Every generator and every load attaches to a bus. Generation, imports and power arriving over lines enter its balance; demand, exports, pumping consumption and power leaving over lines leave it.

Where the CMO forms

The marginal cost of operation (CMO) is the shadow price of the bus load balance: the cost of serving one additional MWh of demand at that bus.

Scales without restructuring

The model goes from a handful of buses to hundreds or thousands without structural changes. A single-bus system, with no lines, is a valid starting point.

At every bus and block, what comes in equals what goes out In Out Bus Generation (hydro, thermal, non-controllable) Imports (contracts) Arriving over lines Deficit: closes the gap Load Exports (contracts) Leaving over lines Pumping station consumption Excess generation CMO: the cost of serving 1 additional MWh of demand at this bus ($/MWh)
Figure: the load balance of one bus. Schematic illustration, not to scale.
  • Load deficit, by segment MW
  • Excess generation MW

In each block, the generation injected at the bus, the power entering over lines and import contracts and the deficit, less the power leaving over lines and export contracts, the pumping consumption and the excess, equal the load. Deficit and excess are the two slacks of this balance. The CMO is not a decision but a result: it is reported at each bus and block as the spot price.

  • A bus identifier and name.
  • The bus_id of every entity that attaches to it: hydro plants, thermal plants, non-controllable sources, pumping stations, energy contracts and the two ends of each line.
  • Optionally, deficit segments for this bus, which replace the case default. They cannot vary by stage.
  • The load at the bus, supplied as scenario data (see the Load page).
  • Subsystem. In the Brazilian grid, a subsystem is a region of the interconnected system (SE/CO, S, NE, N). Real-world dispatch studies often model buses at that scale, but finer decompositions are equally valid.
  • Single bus (copper plate). All generation and load sit in one node: no flow limits, no transmission losses and no locational price differentiation. It is the right starting point to isolate dispatch economics from network effects.
  • Multi-bus. Buses are connected by lines. Once a line capacity binds, each bus resolves its own marginal price, and dispatch in one bus cannot freely substitute for a shortfall in another.