Skip to content

Hydro plants

Hydro plants convert the potential energy of stored water into electricity. Each plant has a reservoir, turbines and spillways, and plants are typically arranged in cascades: each plant receives its own incremental inflow plus the turbined and spilled water released by the plants upstream.

Water stored today, used tomorrow

Reservoir storage creates temporal coupling: water saved today is available tomorrow.

Uncertain future rain

Inflows are stochastic: future rain or snowmelt is uncertain.

Value of water

The opportunity cost of using water now instead of storing it emerges from the optimization.

Inflowincremental inflow +upstream releases Evaporation and withdrawal Spillagepasses without generating Turbined flow→ turbine Outflow→ downstream plant Diversion→ another channel or plant Reservoir storage in hm³ Useful volume Dead volume Dam productivity or FPHA Head Bus generation in MW
Simplified illustration: the water paths in a hydro plant. The full diagram, with travel time and pumping stations, is on the technical page.
  • End-of-stage storage hm³
  • Turbined flow m³/s
  • Spillage m³/s
  • Diversion m³/s
  • Generation MW

End-of-stage storage is a state variable: the value the optimizer chooses links the stage to the next one. Total outflow is turbined flow plus spillage.

  • The downstream plant (cascade topology) and, optionally, the water travel time to it, in hours.
  • Reservoir storage limits (the minimum is the dead volume), in hm³, and total outflow limits, in m³/s.
  • One or more generating unit groups, each with its own bus, turbined-flow limits and generation limits.
  • Generation model: constant productivity or FPHA (approximated hydro production function), with its data coming from the production-model files.
  • Optionally: evaporation (12 monthly values), a diversion channel (destination plant and capacity), dead-volume filling and plant-specific penalties.
  • Entry and exit stages, when the plant does not exist throughout the study.
  • The initial storage of each reservoir, in the initial conditions.

At each stage, a hydro plant is in pre-filling, dead-volume filling or operation:

1. Pre-filling

The plant does not yet exist in the dispatch. Turbined flow, spillage and diversion are fixed at zero, storage is held constant, and the natural inflow is passed to the first downstream plant that is not in pre-filling.

2. Dead-volume filling

Runs from the filling start stage to the entry stage. The plant does not generate and the reservoir accumulates water up to the dead volume, following a per-stage filling floor. Spillage is a free decision.

3. Operating

The plant can generate and is subject to the generation constraints. For a plant that went through filling, the dead volume applies again as a soft storage floor.

A plant without filling and without an operation window is operating at every stage. With a window, it is operating inside it and in pre-filling before the entry stage and from the exit stage onward. A plant with filling has no exit stage, so it never returns to pre-filling.

By default, water released by a plant reaches the downstream plant within the same stage. When the reach between the two is long enough, the plant can declare a water travel time on its main cascade reach: part of the outflow arrives downstream within the stage and the rest arrives in later stages.

Water still in transit becomes part of the model state (in-transit buckets), together with storage and the inflow lags. Travel time applies only to the main cascade reach; diversion and pumping are instantaneous, and a missing or zero time means an instantaneous transfer. When the study starts with water already in transit, the pre-study outflows are provided in the initial conditions.